| Name | Project | Type | Compare |
|---|---|---|---|
| Budapest, Kazán | ENERGY4ALL | PED Lab | Compare |
| Stavanger, PED Hillevåg | ENERGY4ALL | PED Case Study | Compare |
| Budapest, District IV | ASCEND – Accelerate poSitive Clean ENergy Districts, ENERGY4ALL | PED Relevant Case Study | Compare |
| Rome, Quarticciolo | ENERGY4ALL | PED Lab | |
| Winterthur, WinLab | PERSIST | PED Lab | Compare |
| Luzern Living Lab, Wesemlin-Dreilinden | PERSIST | PED Lab | Compare |
| Iruña-Pamplona, Rochapea, Navarra | PERSIST | PED Relevant Case Study / PED Lab | Compare |
| Hradec Králové, Kukleny | RESPED – Enabling Energy Resilience through new energy flexible and affordable PED concepts | PED Case Study | Compare |
| Thessaloniki, Residential buildings | FLEdge | PED Relevant Case Study | Compare |
| Kavala, Offices in University premises | FLEdge | PED Relevant Case Study | Compare |
| Sofia, Offices and Premises in university | FLEdge | PED Relevant Case Study | Compare |
| The city of Carcavelos, Portugal | CSP – Cascais Smart Pole | PED Relevant Case Study | Compare |
| Verdal Kommune, Trøndelag | PERSIST | PED Case Study | Compare |
| Cluj-Napoca, UTCN Dormitories | PERSIST | PED Lab | Compare |
| Alba Iulia, Social blocks, str. Marcus Aurelius | PERSIST | PED Lab | Compare |
| Leeuwarden/de Zwette | PED Lab | Compare | |
| Örebro-Vivalla | JUST PEPP | PED Relevant Case Study | Compare |
| Tiurberget, Kongsvinger | JUST PEPP | PED Relevant Case Study | Compare |
| Texel | JUST PEPP | PED Relevant Case Study | Compare |
| Hällefors, Sweden | JUST PEPP | PED Relevant Case Study | Compare |
| Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona | OPEN4CEC | PED Lab | Compare |
| Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab | OPEN4CEC | PED Lab | Compare |
| Pamplona | OPEN4CEC | PED Lab | Compare |
| Trondheim, Svartlamon | OPEN4CEC | PED Lab | Compare |
| Savona, The University of Genova, Savona Campus | OPEN4CEC | PED Lab | Compare |
| Torres Vedras, Encosta de São Vicente | COPPER | PED Lab | Compare |
| Malmö, Stadium area (Stadionområdet) | PED StepWise | PED Case Study | Compare |
| Utrecht, Utrecht Science Park | PED StepWise | PED Relevant Case Study | Compare |
| Vienna, Kriegerheimstätten | PED StepWise | PED Relevant Case Study | Uncompare |
| Vienna, 16. District, Leben am Wilhelminenberg | HeatCOOP | PED Relevant Case Study | Compare |
| Vienna, Laxenburgerstraße AH | HeatCOOP | PED Lab | Compare |
| Tartu, Annelinn | V2G-QUESTS | PED Relevant Case Study | Compare |
| Utrecht, Kanaleneiland | V2G-QUESTS | PED Relevant Case Study | Compare |
| Aveiro, Aradas district | V2G-QUESTS | PED Relevant Case Study | Compare |
| Győr, Geothermal District Heating Project | PED Relevant Case Study | Compare | |
| Drammen, Jacobs Borchs Gate | PED Relevant Case Study | Compare | |
| Freiburg im Breisgau, Dietenbach | PED Relevant Case Study | Compare | |
| Lecce, SmartEnCity | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study | Compare |
| Trento, STARDUST | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study / PED Lab | Compare |
| Malmö, Klimatkontrakt Hyllie | PED Relevant Case Study | Compare | |
| Kaiserslautern, EnStadt:Pfaff | PED Relevant Case Study / PED Lab | Compare | |
| Helsinki, mySMARTlife | PED Relevant Case Study | Compare | |
| Firenze, Novoli-Cascine district on “le PIagge” buildings | PED Relevant Case Study | Compare | |
| Bolzano, Sinfonia | PED Relevant Case Study | Compare | |
| Zürich, Hunziker Areal | PED Relevant Case Study | Compare | |
| Hammarby Sjöstad, Hammarby Sjöstad 2.0 | PED Relevant Case Study | Compare | |
| Milano, Sharing Cities | PED Relevant Case Study | Compare | |
| Mieres, District Heating Pozo Barredo | PED Relevant Case Study | Compare | |
| Lund, Cityfied (demo Linero) | PED Relevant Case Study | Compare | |
| Espoo, Smart Otaniemi | PED Relevant Case Study / PED Lab | Compare | |
| Vienna, Zukunftsquartier | PED Case Study | Compare | |
| Trento, Santa Chiara Open Lab | PED Case Study | Compare | |
| Paterna, Barrio La Pinada | PED Case Study / PED Lab | Compare | |
| Bergen, Zero Village Bergen (ZVB) | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Võru, +CityxChange | PED Case Study | Compare | |
| Trondheim, NTNU Campus within the Knowledge Axis | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Oslo, Furuset project | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Măgurele, Laser Valley – Land of Lights | PED Case Study | Compare | |
| Elverum, Ydalir project | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Bodø, Airport, NyBy – Ny Flyplass (New City – New Airport) | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Bærum, Fornebu | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
| Carquefou, Fleuraye west | PED Case Study | Compare | |
| Åland, Smart Energy | PED Case Study | Compare | |
| Romania, Alba Iulia PED | ASCEND – Accelerate poSitive Clean ENergy Districts | PED Case Study | Compare |
| Romania, Alba Iulia PED | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
| Munich, Harthof district | PED Case Study | Compare | |
| Lublin | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
| Bærum, Eiksveien 116 | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Uncompare |
| Findhorn, the Park | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
| Amsterdam, Buiksloterham PED | ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities | PED Case Study | Compare |
| Schönbühel-Aggsbach, Schönbühel an der Donau | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
| Umeå, Ålidhem district | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
| Aalborg East | PED Relevant Case Study / PED Lab | Compare | |
| Ankara, Çamlık District | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study / PED Relevant Case Study | Compare |
| Trenčín | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Luxembourg, Betzdorf | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
| Vantaa, Aviapolis | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
| Vidin, Himik and Bononia | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Oslo, Verksbyen | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
| Uden, Loopkantstraat | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Relevant Case Study | Compare |
| Zaragoza, Actur | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Relevant Case Study | Compare |
| Aarhus, Brabrand | BIPED – Building Intelligent Positive Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Uncompare |
| Riga, Ķīpsala, RTU smart student city | ExPEDite – Enabling Positive Energy Districts through Digital Twins | PED Case Study | Compare |
| Izmir, District of Karşıyaka | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
| Istanbul, Ozyegin University Campus | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
| Espoo, Kera | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study / PED Relevant Case Study | Compare |
| Borlänge, Rymdgatan’s Residential Portfolio | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
| Freiburg, Waldsee | PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district | PED Case Study | Compare |
| Innsbruck, Campagne-Areal | PED Relevant Case Study | Compare | |
| Graz, Reininghausgründe | PED Case Study | Compare | |
| Stor-Elvdal, Campus Evenstad | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Relevant Case Study | Compare |
| Oulu, Kaukovainio | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Halmstad, Fyllinge | PED Relevant Case Study | Compare | |
| Lund, Brunnshög district | PED Case Study | Compare | |
| Vienna, Am Kempelenpark | PED Case Study | Uncompare | |
| Évora, Portugal | POCITYF – A POsitive Energy CITY Transformation Framework | PED Relevant Case Study / PED Lab | Compare |
| Kladno, Sletiště (Sport Area), PED Winter Stadium | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
| Groningen, PED South | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
| Groningen, PED North | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
| Maia, Sobreiro Social Housing | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Lab | Compare |
| Lubia (Soria), CEDER-CIEMAT | PED Lab | Compare | |
| Tampere, Ilokkaanpuisto district | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study | Compare |
| Leon, Former Sugar Factory district | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Istanbul, Kadikoy district, Caferaga | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
| Espoo, Leppävaara district, Sello center | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
| Espoo, Espoonlahti district, Lippulaiva block | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
| Salzburg, Gneis district | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
| Barcelona, Santa Coloma de Gramenet | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
| Tartu, City centre area | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study / PED Lab | Compare |
| Bologna, Pilastro-Roveri district | GRETA – GReen Energy Transition Actions | PED Relevant Case Study | Compare |
| Barcelona, SEILAB & Energy SmartLab | PED Lab | Compare | |
| Leipzig, Baumwollspinnerei district | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
| Kifissia, Energy community | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
| Title | Rome, Quarticciolo | Aarhus, Brabrand | Vienna, Kriegerheimstätten | Bærum, Eiksveien 116 | Vienna, Am Kempelenpark |
|---|---|---|---|---|---|
| A1P001: Name of the PED case study / PED Lab | |||||
| A1P001: Name of the PED case study / PED Lab | Rome, Quarticciolo | Aarhus, Brabrand | Vienna, Kriegerheimstätten | Bærum, Eiksveien 116 | Vienna, Am Kempelenpark |
| A1P002: Map / aerial view / photos / graphic details / leaflet | |||||
| A1P002: Map / aerial view / photos / graphic details / leaflet |
| ||||
| A1P003: Categorisation of the PED site | |||||
| PED case study | no | yes | no | no | yes |
| PED relevant case study | no | yes | yes | yes | no |
| PED Lab. | yes | yes | no | no | no |
| A1P004: Targets of the PED case study / PED Lab | |||||
| Climate neutrality | yes | yes | yes | yes | yes |
| Annual energy surplus | no | yes | no | no | yes |
| Energy community | yes | yes | no | no | no |
| Circularity | no | no | no | no | no |
| Air quality and urban comfort | no | no | yes | no | no |
| Electrification | no | no | yes | yes | no |
| Net-zero energy cost | no | no | no | yes | no |
| Net-zero emission | no | yes | no | yes | no |
| Self-sufficiency (energy autonomous) | no | no | no | no | no |
| Maximise self-sufficiency | no | no | no | no | no |
| Other | yes | no | no | no | no |
| Other (A1P004) | Fighting energy and social poverty | ||||
| A1P005: Phase of the PED case study / PED Lab | |||||
| A1P005: Project Phase of your case study/PED Lab | Planning Phase | Planning Phase | Planning Phase | Completed | Planning Phase |
| A1P006: Start Date | |||||
| A1P006: Start date | 01/24 | 01/24 | 01/23 | 01/18 | 07/16 |
| A1P007: End Date | |||||
| A1P007: End date | 12/26 | 12/26 | 12/30 | 06/23 | 02/25 |
| A1P008: Reference Project | |||||
| A1P008: Reference Project | |||||
| A1P009: Data availability | |||||
| A1P009: Data availability |
|
| |||
| A1P009: Other | |||||
| A1P010: Sources | |||||
| Any publication, link to website, deliverable referring to the PED/PED Lab | |||||
| A1P011: Geographic coordinates | |||||
| X Coordinate (longitude): | 12.581817833742978 | 10.213405 | 16.475416 | 10.5333 | 16.395292 |
| Y Coordinate (latitude): | 41.89305366790891 | 56.149628 | 48.234011 | 59.9100 | 48.173598 |
| A1P012: Country | |||||
| A1P012: Country | Italy | Denmark | Austria | Norway | Austria |
| A1P013: City | |||||
| A1P013: City | Rome | Aarhus | Vienna | Bærum | Vienna |
| A1P014: Climate Zone (Köppen Geiger classification) | |||||
| A1P014: Climate Zone (Köppen Geiger classification). | Csa | Cfb | Cfb | Dfb | Cwb |
| A1P015: District boundary | |||||
| A1P015: District boundary | Functional | Geographic | Geographic | Other | Geographic |
| Other | Building | ||||
| A1P016: Ownership of the case study/PED Lab | |||||
| A1P016: Ownership of the case study/PED Lab: | Public | Mixed | Private | Public | Private |
| A1P017: Ownership of the land / physical infrastructure | |||||
| A1P017: Ownership of the land / physical infrastructure: | Single Owner | Single Owner | Single Owner | Single Owner | Single Owner |
| A1P018: Number of buildings in PED | |||||
| A1P018: Number of buildings in PED | 1 | 6 | |||
| A1P019: Conditioned space | |||||
| A1P019: Conditioned space [m²] | |||||
| A1P020: Total ground area | |||||
| A1P020: Total ground area [m²] | 358 | 124000 | |||
| A1P021: Floor area ratio: Conditioned space / total ground area | |||||
| A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 0 | 0 | 0 | 0 |
| A1P022: Financial schemes | |||||
| A1P022a: Financing - PRIVATE - Real estate | no | no | no | no | no |
| A1P022a: Add the value in EUR if available [EUR] | |||||
| A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no |
| A1P022b: Add the value in EUR if available [EUR] | |||||
| A1P022c: Financing - PRIVATE - Other | yes | no | yes | no | no |
| A1P022c: Add the value in EUR if available [EUR] | |||||
| A1P022d: Financing - PUBLIC - EU structural funding | no | no | no | no | no |
| A1P022d: Add the value in EUR if available [EUR] | |||||
| A1P022e: Financing - PUBLIC - National funding | no | no | no | no | no |
| A1P022e: Add the value in EUR if available [EUR] | |||||
| A1P022f: Financing - PUBLIC - Regional funding | no | no | no | no | no |
| A1P022f: Add the value in EUR if available [EUR] | |||||
| A1P022g: Financing - PUBLIC - Municipal funding | no | no | no | yes | no |
| A1P022g: Add the value in EUR if available [EUR] | |||||
| A1P022h: Financing - PUBLIC - Other | no | no | no | no | no |
| A1P022h: Add the value in EUR if available [EUR] | |||||
| A1P022i: Financing - RESEARCH FUNDING - EU | no | yes | no | no | no |
| A1P022i: Add the value in EUR if available [EUR] | |||||
| A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | no | no |
| A1P022j: Add the value in EUR if available [EUR] | |||||
| A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no |
| A1P022k: Add the value in EUR if available [EUR] | |||||
| A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no |
| A1P022l: Add the value in EUR if available [EUR] | |||||
| A1P022: Other | |||||
| A1P023: Economic Targets | |||||
| A1P023: Economic Targets |
|
| |||
| A1P023: Other | Social housing | ||||
| A1P024: More comments: | |||||
| A1P024: More comments: | |||||
| A1P025: Estimated PED case study / PED LAB costs | |||||
| A1P025: Estimated PED case study / PED LAB costs [mil. EUR] | |||||
| Contact person for general enquiries | |||||
| A1P026: Name | Stefanija Hrle Aiello | Johanne Bräuner Nygaard Hansen | Gerhard Hofer (e7 GmbH) | John Einar Thommesen | Gerhard Hofer |
| A1P027: Organization | Eutropian Associazione | ITK, the city of Aarhus | e7 GmbH | SINTEF Community | e7 energy innovation & engineering |
| A1P028: Affiliation | Research Center / University | Municipality / Public Bodies | SME / Industry | Municipality / Public Bodies | SME / Industry |
| A1P028: Other | |||||
| A1P029: Email | Stefanija.hrle@eutropian.org | hjobr@aarhus.dk | gerhard.hofer@e-sieben.at | john.thommesen@sintef.no | gerhard.hofer@e-sieben.at |
| Contact person for other special topics | |||||
| A1P030: Name | John Einar Thommesen | ||||
| A1P031: Email | john.thommesen@sintef.no | ||||
| Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes |
| A2P001: Fields of application | |||||
| A2P001: Fields of application |
|
|
|
| |
| A2P001: Other | Reducing CO2eq Emissions | ||||
| A2P002: Tools/strategies/methods applied for each of the above-selected fields | |||||
| A2P002: Tools/strategies/methods applied for each of the above-selected fields | |||||
| A2P003: Application of ISO52000 | |||||
| A2P003: Application of ISO52000 | |||||
| A2P004: Appliances included in the calculation of the energy balance | |||||
| A2P004: Appliances included in the calculation of the energy balance | No | ||||
| A2P005: Mobility included in the calculation of the energy balance | |||||
| A2P005: Mobility included in the calculation of the energy balance | Yes | No | |||
| A2P006: Description of how mobility is included (or not included) in the calculation | |||||
| A2P006: Description of how mobility is included (or not included) in the calculation | Not determined yet | ||||
| A2P007: Annual energy demand in buildings / Thermal demand | |||||
| A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum] | 4.97 | ||||
| A2P008: Annual energy demand in buildings / Electric Demand | |||||
| A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum] | 0.75 | ||||
| A2P009: Annual energy demand for e-mobility | |||||
| A2P009: Annual energy demand for e-mobility [GWh/annum] | |||||
| A2P010: Annual energy demand for urban infrastructure | |||||
| A2P010: Annual energy demand for urban infrastructure [GWh/annum] | |||||
| A2P011: Annual renewable electricity production on-site during target year | |||||
| A2P011: PV | no | no | no | no | no |
| A2P011: PV - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: Wind | no | no | no | no | no |
| A2P011: Wind - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: Hydro | no | no | no | no | no |
| A2P011: Hydro - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: Biomass_el | no | no | no | no | no |
| A2P011: Biomass_el - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: Biomass_peat_el | no | no | no | no | no |
| A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: PVT_el | no | no | no | no | no |
| A2P011: PVT_el - specify production in GWh/annum [GWh/annum] | |||||
| A2P011: Other | no | no | no | no | no |
| A2P011: Other - specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Annual renewable thermal production on-site during target year | |||||
| A2P012: Geothermal | no | no | no | no | no |
| A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Solar Thermal | no | no | no | no | no |
| A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Biomass_heat | no | no | no | no | no |
| A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Waste heat+HP | no | no | no | no | no |
| A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Biomass_peat_heat | no | no | no | no | no |
| A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: PVT_th | no | no | no | no | no |
| A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Biomass_firewood_th | no | no | no | no | no |
| A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P012: Other | no | no | no | no | no |
| A2P012 - Other: Please specify production in GWh/annum [GWh/annum] | |||||
| A2P013: Renewable resources on-site - Additional notes | |||||
| A2P013: Renewable resources on-site - Additional notes | |||||
| A2P014: Annual energy use | |||||
| A2P014: Annual energy use [GWh/annum] | |||||
| A2P015: Annual energy delivered | |||||
| A2P015: Annual energy delivered [GWh/annum] | |||||
| A2P016: Annual non-renewable electricity production on-site during target year | |||||
| A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum] | |||||
| A2P017: Annual non-renewable thermal production on-site during target year | |||||
| A2P017: Gas | no | no | no | no | no |
| A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||
| A2P017: Coal | no | no | no | no | no |
| A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||
| A2P017: Oil | no | no | no | no | no |
| A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||
| A2P017: Other | no | no | no | no | no |
| A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||
| A2P018: Annual renewable electricity imports from outside the boundary during target year | |||||
| A2P018: PV | no | no | no | no | no |
| A2P018 - PV: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: Wind | no | no | no | no | no |
| A2P018 - Wind: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: Hydro | no | no | no | no | no |
| A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: Biomass_el | no | no | no | no | no |
| A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: Biomass_peat_el | no | no | no | no | no |
| A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: PVT_el | no | no | no | no | no |
| A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P018: Other | no | no | no | no | no |
| A2P018 - Other: specify production in GWh/annum if available [GWh/annum] | |||||
| A2P019: Annual renewable thermal imports from outside the boundary during target year | |||||
| A2P019: Geothermal | no | no | no | no | no |
| A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Solar Thermal | no | no | no | no | no |
| A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Biomass_heat | no | no | no | no | no |
| A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Waste heat+HP | no | no | no | no | no |
| A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Biomass_peat_heat | no | no | no | no | no |
| A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: PVT_th | no | no | no | no | no |
| A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Biomass_firewood_th | no | no | no | no | no |
| A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P019: Other | no | no | no | no | no |
| A2P019 Other: Please specify imports in GWh/annum [GWh/annum] | |||||
| A2P020: Share of RES on-site / RES outside the boundary | |||||
| A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 |
| A2P021: GHG-balance calculated for the PED | |||||
| A2P021: GHG-balance calculated for the PED [tCO2/annum] | |||||
| A2P022: KPIs related to the PED case study / PED Lab | |||||
| A2P022: Safety & Security | |||||
| A2P022: Health | |||||
| A2P022: Education | |||||
| A2P022: Mobility | |||||
| A2P022: Energy | Fight energy poverty | Yes | |||
| A2P022: Water | |||||
| A2P022: Economic development | |||||
| A2P022: Housing and Community | improve quality of life in the social housing estates | ||||
| A2P022: Waste | |||||
| A2P022: Other | |||||
| A2P023: Technological Solutions / Innovations - Energy Generation | |||||
| A2P023: Photovoltaics | yes | no | yes | no | no |
| A2P023: Solar thermal collectors | no | no | yes | no | no |
| A2P023: Wind Turbines | no | no | no | no | no |
| A2P023: Geothermal energy system | no | no | yes | no | no |
| A2P023: Waste heat recovery | no | no | no | no | no |
| A2P023: Waste to energy | no | no | no | no | no |
| A2P023: Polygeneration | no | no | no | no | no |
| A2P023: Co-generation | no | no | no | no | no |
| A2P023: Heat Pump | no | no | yes | no | no |
| A2P023: Hydrogen | no | no | no | no | no |
| A2P023: Hydropower plant | no | no | no | no | no |
| A2P023: Biomass | no | no | no | no | no |
| A2P023: Biogas | no | no | no | no | no |
| A2P023: Other | |||||
| A2P024: Technological Solutions / Innovations - Energy Flexibility | |||||
| A2P024: A2P024: Information and Communication Technologies (ICT) | no | no | no | no | no |
| A2P024: Energy management system | no | no | no | no | no |
| A2P024: Demand-side management | yes | no | no | no | no |
| A2P024: Smart electricity grid | no | no | no | no | no |
| A2P024: Thermal Storage | no | no | yes | no | no |
| A2P024: Electric Storage | no | no | no | no | no |
| A2P024: District Heating and Cooling | no | no | yes | no | no |
| A2P024: Smart metering and demand-responsive control systems | no | no | no | no | no |
| A2P024: P2P – buildings | no | no | no | no | no |
| A2P024: Other | |||||
| A2P025: Technological Solutions / Innovations - Energy Efficiency | |||||
| A2P025: Deep Retrofitting | no | no | no | no | no |
| A2P025: Energy efficiency measures in historic buildings | no | no | no | no | no |
| A2P025: High-performance new buildings | no | no | no | no | no |
| A2P025: Smart Public infrastructure (e.g. smart lighting) | no | no | no | no | no |
| A2P025: Urban data platforms | yes | no | no | no | no |
| A2P025: Mobile applications for citizens | no | no | no | no | no |
| A2P025: Building services (HVAC & Lighting) | no | no | no | no | no |
| A2P025: Smart irrigation | no | no | no | no | no |
| A2P025: Digital tracking for waste disposal | no | no | no | no | no |
| A2P025: Smart surveillance | no | no | no | no | no |
| A2P025: Other | |||||
| A2P026: Technological Solutions / Innovations - Mobility | |||||
| A2P026: Efficiency of vehicles (public and/or private) | no | no | no | no | no |
| A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | no | no | no | no | no |
| A2P026: e-Mobility | no | no | no | no | no |
| A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | no | no |
| A2P026: Car-free area | no | no | no | no | no |
| A2P026: Other | |||||
| A2P027: Mobility strategies - Additional notes | |||||
| A2P027: Mobility strategies - Additional notes | |||||
| A2P028: Energy efficiency certificates | |||||
| A2P028: Energy efficiency certificates | |||||
| A2P028: If yes, please specify and/or enter notes | |||||
| A2P029: Any other building / district certificates | |||||
| A2P029: Any other building / district certificates | |||||
| A2P029: If yes, please specify and/or enter notes | |||||
| A3P001: Relevant city /national strategy | |||||
| A3P001: Relevant city /national strategy |
| ||||
| A3P002: Quantitative targets included in the city / national strategy | |||||
| A3P002: Quantitative targets included in the city / national strategy | |||||
| A3P003: Strategies towards decarbonization of the gas grid | |||||
| A3P003: Strategies towards decarbonization of the gas grid | |||||
| A3P003: Other | |||||
| A3P004: Identification of needs and priorities | |||||
| A3P004: Identification of needs and priorities | Nursing home for people with special needs | ||||
| A3P005: Sustainable behaviour | |||||
| A3P005: Sustainable behaviour | |||||
| A3P006: Economic strategies | |||||
| A3P006: Economic strategies |
|
| |||
| A3P006: Other | |||||
| A3P007: Social models | |||||
| A3P007: Social models |
|
|
| ||
| A3P007: Other | |||||
| A3P008: Integrated urban strategies | |||||
| A3P008: Integrated urban strategies |
|
| |||
| A3P008: Other | |||||
| A3P009: Environmental strategies | |||||
| A3P009: Environmental strategies |
|
|
| ||
| A3P009: Other | PEB | ||||
| A3P010: Legal / Regulatory aspects | |||||
| A3P010: Legal / Regulatory aspects | |||||
| B1P001: PED/PED relevant concept definition | |||||
| B1P001: PED/PED relevant concept definition | PEB | ||||
| B1P002: Motivation behind PED/PED relevant project development | |||||
| B1P002: Motivation behind PED/PED relevant project development | |||||
| B1P003: Environment of the case study area | |||||
| B2P003: Environment of the case study area | Urban area | Urban area | |||
| B1P004: Type of district | |||||
| B2P004: Type of district |
|
| |||
| B1P005: Case Study Context | |||||
| B1P005: Case Study Context |
|
| |||
| B1P006: Year of construction | |||||
| B1P006: Year of construction | |||||
| B1P007: District population before intervention - Residential | |||||
| B1P007: District population before intervention - Residential | |||||
| B1P008: District population after intervention - Residential | |||||
| B1P008: District population after intervention - Residential | |||||
| B1P009: District population before intervention - Non-residential | |||||
| B1P009: District population before intervention - Non-residential | |||||
| B1P010: District population after intervention - Non-residential | |||||
| B1P010: District population after intervention - Non-residential | |||||
| B1P011: Population density before intervention | |||||
| B1P011: Population density before intervention | 0 | 0 | 0 | 0 | |
| B1P012: Population density after intervention | |||||
| B1P012: Population density after intervention | 0 | 0 | 0 | 0 | |
| B1P013: Building and Land Use before intervention | |||||
| B1P013: Residential | no | no | no | no | no |
| B1P013 - Residential: Specify the sqm [m²] | |||||
| B1P013: Office | no | no | no | no | yes |
| B1P013 - Office: Specify the sqm [m²] | |||||
| B1P013: Industry and Utility | no | no | no | no | no |
| B1P013 - Industry and Utility: Specify the sqm [m²] | |||||
| B1P013: Commercial | no | no | no | no | yes |
| B1P013 - Commercial: Specify the sqm [m²] | |||||
| B1P013: Institutional | no | no | no | no | no |
| B1P013 - Institutional: Specify the sqm [m²] | |||||
| B1P013: Natural areas | no | no | no | no | no |
| B1P013 - Natural areas: Specify the sqm [m²] | |||||
| B1P013: Recreational | no | no | no | no | no |
| B1P013 - Recreational: Specify the sqm [m²] | |||||
| B1P013: Dismissed areas | no | no | no | no | no |
| B1P013 - Dismissed areas: Specify the sqm [m²] | |||||
| B1P013: Other | no | no | no | no | no |
| B1P013 - Other: Specify the sqm [m²] | |||||
| B1P014: Building and Land Use after intervention | |||||
| B1P014: Residential | no | no | no | no | yes |
| B1P014 - Residential: Specify the sqm [m²] | |||||
| B1P014: Office | no | no | no | no | yes |
| B1P014 - Office: Specify the sqm [m²] | |||||
| B1P014: Industry and Utility | no | no | no | no | no |
| B1P014 - Industry and Utility: Specify the sqm [m²] | |||||
| B1P014: Commercial | no | no | no | no | yes |
| B1P014 - Commercial: Specify the sqm [m²] | |||||
| B1P014: Institutional | no | no | no | no | no |
| B1P014 - Institutional: Specify the sqm [m²] | |||||
| B1P014: Natural areas | no | no | no | no | no |
| B1P014 - Natural areas: Specify the sqm [m²] | |||||
| B1P014: Recreational | no | no | no | no | no |
| B1P014 - Recreational: Specify the sqm [m²] | |||||
| B1P014: Dismissed areas | no | no | no | no | no |
| B1P014 - Dismissed areas: Specify the sqm [m²] | |||||
| B1P014: Other | no | no | no | no | no |
| B1P014 - Other: Specify the sqm [m²] | |||||
| B2P001: PED Lab concept definition | |||||
| B2P001: PED Lab concept definition | |||||
| B2P002: Installation life time | |||||
| B2P002: Installation life time | |||||
| B2P003: Scale of action | |||||
| B2P003: Scale | District | ||||
| B2P004: Operator of the installation | |||||
| B2P004: Operator of the installation | |||||
| B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||
| B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||
| B2P006: Circular Economy Approach | |||||
| B2P006: Do you apply any strategy to reuse and recycling the materials? | |||||
| B2P006: Other | |||||
| B2P007: Motivation for developing the PED Lab | |||||
| B2P007: Motivation for developing the PED Lab |
| ||||
| B2P007: Other | |||||
| B2P008: Lead partner that manages the PED Lab | |||||
| B2P008: Lead partner that manages the PED Lab | Research center/University | ||||
| B2P008: Other | |||||
| B2P009: Collaborative partners that participate in the PED Lab | |||||
| B2P009: Collaborative partners that participate in the PED Lab |
| ||||
| B2P009: Other | |||||
| B2P010: Synergies between the fields of activities | |||||
| B2P010: Synergies between the fields of activities | |||||
| B2P011: Available facilities to test urban configurations in PED Lab | |||||
| B2P011: Available facilities to test urban configurations in PED Lab | |||||
| B2P011: Other | |||||
| B2P012: Incubation capacities of PED Lab | |||||
| B2P012: Incubation capacities of PED Lab | |||||
| B2P013: Availability of the facilities for external people | |||||
| B2P013: Availability of the facilities for external people | |||||
| B2P014: Monitoring measures | |||||
| B2P014: Monitoring measures | |||||
| B2P015: Key Performance indicators | |||||
| B2P015: Key Performance indicators |
| ||||
| B2P016: Execution of operations | |||||
| B2P016: Execution of operations | |||||
| B2P017: Capacities | |||||
| B2P017: Capacities | |||||
| B2P018: Relations with stakeholders | |||||
| B2P018: Relations with stakeholders | |||||
| B2P019: Available tools | |||||
| B2P019: Available tools |
| ||||
| B2P019: Available tools | |||||
| B2P020: External accessibility | |||||
| B2P020: External accessibility | |||||
| C1P001: Unlocking Factors | |||||
| C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P001: Energy Communities, P2P, Prosumers concepts | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant |
| C1P001: Storage systems and E-mobility market penetration | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
| C1P001: Decreasing costs of innovative materials | 4 - Important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant |
| C1P001: Financial mechanisms to reduce costs and maximize benefits | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant |
| C1P001: The ability to predict Multiple Benefits | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant |
| C1P001: The ability to predict the distribution of benefits and impacts | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant |
| C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant |
| C1P001: Social acceptance (top-down) | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant |
| C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 5 - Very important | 1 - Unimportant | 4 - Important | 5 - Very important | 1 - Unimportant |
| C1P001: Presence of integrated urban strategies and plans | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 1 - Unimportant |
| C1P001: Multidisciplinary approaches available for systemic integration | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant |
| C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 5 - Very important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant |
| C1P001: Availability of RES on site (Local RES) | 5 - Very important | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant |
| C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P001: Any other UNLOCKING FACTORS (if any) | |||||
| C1P002: Driving Factors | |||||
| C1P002: Climate Change adaptation need | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P002: Climate Change mitigation need (local RES production and efficiency) | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P002: Rapid urbanization trend and need of urban expansions | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P002: Urban re-development of existing built environment | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P002: Economic growth need | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P002: Territorial and market attractiveness | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P002: Energy autonomy/independence | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P002: Any other DRIVING FACTOR | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P002: Any other DRIVING FACTOR (if any) | |||||
| C1P003: Administrative barriers | |||||
| C1P003: Difficulty in the coordination of high number of partners and authorities | 2 - Slightly important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Lack of good cooperation and acceptance among partners | 2 - Slightly important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Lack of public participation | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P003: Lack of institutions/mechanisms to disseminate information | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P003:Long and complex procedures for authorization of project activities | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P003: Complicated and non-comprehensive public procurement | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Fragmented and or complex ownership structure | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P003: City administration & cross-sectoral attitude/approaches (silos) | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Lack of internal capacities to support energy transition | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P003: Any other Administrative BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P003: Any other Administrative BARRIER (if any) | |||||
| C1P004: Policy barriers | |||||
| C1P004: Lack of long-term and consistent energy plans and policies | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P004: Lacking or fragmented local political commitment and support on the long term | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P004: Lack of Cooperation & support between national-regional-local entities | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P004: Any other Political BARRIER (if any) | |||||
| C1P005: Legal and Regulatory barriers | |||||
| C1P005: Inadequate regulations for new technologies | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Regulatory instability | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Non-effective regulations | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Unfavorable local regulations for innovative technologies | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Building code and land-use planning hindering innovative technologies | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P005: Insufficient or insecure financial incentives | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P005: Shortage of proven and tested solutions and examples | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P005: Any other Legal and Regulatory BARRIER (if any) | |||||
| C1P006: Environmental barriers | |||||
| C1P006: Environmental barriers | |||||
| C1P007: Technical barriers | |||||
| C1P007: Lack of skilled and trained personnel | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Deficient planning | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Retrofitting work in dwellings in occupied state | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P007: Lack of well-defined process | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Inaccuracy in energy modelling and simulation | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Lack/cost of computational scalability | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Grid congestion, grid instability | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Energy retrofitting work in dense and/or historical urban environment | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P007: Difficult definition of system boundaries | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P007: Any other Thecnical BARRIER (if any) | |||||
| C1P008: Social and Cultural barriers | |||||
| C1P008: Inertia | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Lack of values and interest in energy optimization measurements | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Low acceptance of new projects and technologies | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Difficulty of finding and engaging relevant actors | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Lack of trust beyond social network | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Rebound effect | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P008: Hostile or passive attitude towards environmentalism | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P008: Exclusion of socially disadvantaged groups | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P008: Non-energy issues are more important and urgent for actors | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P008: Hostile or passive attitude towards energy collaboration | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P008: Any other Social BARRIER (if any) | |||||
| C1P009: Information and Awareness barriers | |||||
| C1P009: Insufficient information on the part of potential users and consumers | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P009: Lack of awareness among authorities | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P009: Information asymmetry causing power asymmetry of established actors | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P009: High costs of design, material, construction, and installation | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P009: Any other Information and Awareness BARRIER (if any) | |||||
| C1P010: Financial barriers | |||||
| C1P010: Hidden costs | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Insufficient external financial support and funding for project activities | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Economic crisis | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Risk and uncertainty | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Lack of consolidated and tested business models | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Limited access to capital and cost disincentives | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
| C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P010: Any other Financial BARRIER (if any) | |||||
| C1P011: Market barriers | |||||
| C1P011: Split incentives | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P011: Energy price distortion | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
| C1P011: Energy market concentration, gatekeeper actors (DSOs) | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
| C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
| C1P011: Any other Market BARRIER (if any) | |||||
| C1P012: Stakeholders involved | |||||
| C1P012: Government/Public Authorities | |||||
| C1P012: Research & Innovation | |||||
| C1P012: Financial/Funding | |||||
| C1P012: Analyst, ICT and Big Data | |||||
| C1P012: Business process management | |||||
| C1P012: Urban Services providers | |||||
| C1P012: Real Estate developers | |||||
| C1P012: Design/Construction companies | |||||
| C1P012: End‐users/Occupants/Energy Citizens | |||||
| C1P012: Social/Civil Society/NGOs | |||||
| C1P012: Industry/SME/eCommerce | |||||
| C1P012: Other | |||||
| C1P012: Other (if any) | |||||
| Summary |
Authors (framework concept)
Beril Alpagut (Demir Enerji)
Giulia Turci (University of Bologna / UNIBO, Cesena Municipality)
Michal Kuzmic (Czech Technical University in Prague / CTU)
Paolo Civiero (Università Roma Tre)
Vicky Albert-Seifried (Fraunhofer-Institut für Solare Energiesysteme / FHG ISE)
Bailador Ferreras M. Almudena (Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas / CIEMAT)
Serena Pagliulia (University of Bologna / UNIBO)
Oscar Seco (Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas / CIEMAT)
Silvia Soutullo (Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas / CIEMAT)
Daniele Vettorato (EURAC Research / EURAC)
Contributors (to the content)
Laura Aelenei (Laboratório Nacional de Energia e Geologia / LNEG), Nienke Maas (Netherlands Organisation for applied scientific research / TNO), Savis Gohari (Oslo Metropolitan University / OsloMet), Andras Reith (Advanced Building and Urban Design / ABUD), Ghazal Etminan (Austrian Institute of Technology / AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT Technical Research Centre of Finland Ltd / VTT), Mari Hukkalainen (VTT Technical Research Centre of Finland Ltd / VTT), Judith-Borsboom (Locality), Gilda Massa (National Agency for New Technologies, Energy and Sustainable Economic Development / ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (Czech Technical University in Prague / CTU), Sergio Diaz de Garayo Balsategui (Centro Nacional de Energías Renovables / CENER, IEA Annex 83), Christoph Gollner (Austrian Research Promotion Agency / FFG, JPI UE), Silvia Bossi (National Agency for New Technologies, Energy and Sustainable Economic Development / ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science / ZHAW), George Martinopoulos (Centre for Research and Technology Hellas / CERTH), Maria Nuria Sánchez (Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas / CIEMAT), Angelina Tomova (Energy Agency of Plovdiv), Xingxing Zhang (Dalarna University), Juveria Shah (Dalarna University), Mengjie Han (Dalarna University), Oya Tabanoğlu (Demir Enerji)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan (2020-2023), Czech Technical University in Prague: Marek Suchánek (2023-2024)






